Vichy is a commune in the department of Allier in Auvergne in central France. It belongs to the historic province of Bourbonnais. With 80,194 inhabitants, Vichy’s urban area is the second largest in the Auvergne region behind Clermont-Ferrand. It is known as a spa and resort town and was the de facto capital of Vichy France during the World War II Nazi German occupation from 1940 to 1944.
The 1950s and 1960s would become the most ostentatious period for Vichy, complete with parading personalities, visits from crowned heads (The Glaoui, the Pasha of Marrakech, Prince Rainier of Monaco) and profits from a massive influx of North African French clients who holidayed in Vichy, spending lavishly. There were thirteen cinemas (which sometimes showed special previews), eight dance halls and three theatres. It was at this period that the station would take the title of “Reine des villes d’eaux” (Queen of the Spa Towns). From June to September, so many French-Algerian tourists were arriving that it almost seemed like there was an airlift set up between Vichy-Charmeil and the airports of Algeria. Mayor Pierre Coulon (1950–1967) decided to create Lake Allier (June 10, 1963) and Omnisports Park (1963–68), giving the city its current look.
Under the authority of the local communities, much work is being done on building sites and projects, which will deeply modify Vichy in the years to come. The construction by the Hotel of the Community of Agglomeration in September 2005 on the old site of the “Commercial City” may precede the total restoration of the market hall (which would cost €5.9 Million) which would be delivered in September 2006. Other projects include the creation of a 12,000 m2 (130,000 sq ft) mother-child centre in the hospital complex, the restoration of the spa façade (removal of the metal boarding to uncover the original style of 1862), the transformation of the spa into a multi-use center, creation of parks with fountains in place of parking lots, the demolition and the transformation of the buildings in a congested area to create an enterprise center intended to create 800 jobs (opening of the site envisioned at the end of 2007), the construction of a new aquatic stadium including 5 basins (initially envisaged to cost €14.3 million but may end up costing €20 Million) whose delivery is envisaged with the autumn 2007, and finally motorway connection in 2011.