The Royal Opera House is an opera house and major performing arts venue in Covent Garden in London. The large building is often referred to as simply “Covent Garden“, after a previous use of the site of the opera house’s original construction in 1732. It is the home of The Royal Opera, The Royal Ballet, and the Orchestra of the Royal Opera House. Originally called the Theatre Royal, it served primarily as a playhouse for the first hundred years of its history. In 1734, the first ballet was presented. A year later, Handel‘s first season of operas began. Many of his operas and oratorios were specifically written for Covent Garden and had their premieres there.
The current building is the third theatre on the site following disastrous fires in 1808 and 1856. The façade, foyer, and auditorium date from 1858, but almost every other element of the present complex dates from an extensive reconstruction in the 1990s. The main auditorium seats 2,256 people, making it the third largest in London, and consists of four tiers of boxes and balconies and the amphitheatre gallery. The proscenium is 12.20 m wide and 14.80 m high. The main auditorium is a Grade I listed building. The foundation of the Theatre Royal, Covent Garden lies in the letters patent awarded by Charles II to Sir William Davenant in 1660, allowing Davenant to operate one of only two patent theatre companies (The Duke’s Company) in London. The letters patent remained in the possession of the Opera House until shortly after the First World War, when the document was sold to an American university library.
In 1728, John Rich, actor-manager of the Duke’s Company at Lincoln’s Inn Fields Theatre, commissioned The Beggar’s Opera from John Gay. The success of this venture provided him with the capital to build the Theatre Royal (designed by Edward Shepherd) at the site of an ancient convent garden, part of which had been developed by Inigo Jones in the 1630s with a piazza and church. In addition, a Royal Charter had created a fruit and vegetable market in the area, a market which survived in that location until 1974. At its opening on 7 December 1732, Rich was carried by his actors in processional triumph into the theatre for its opening production of William Congreve‘s The Way of the World. A fire destroyed the theatre on 20 September 1808.
Rebuilding began in December 1808, and the second Theatre Royal, Covent Garden (designed by Robert Smirke) opened on 18 September 1809 with a performance of Macbeth followed by a musical entertainment called The Quaker. The actor-manager John Philip Kemble, raised seat prices to help recoup the cost of rebuilding and the cost of an increased ground rent introduced by the landowner, the Duke of Bedford, but the move was so unpopular that audiences disrupted performances by beating sticks, hissing, booing and dancing. The Old Price Riots lasted over two months, and the management was finally forced to accede to the audience’s demands. The Theatres Act 1843 broke the patent theatres’ monopoly of drama. At that time Her Majesty’s Theatre in the Haymarket was the main centre of ballet and opera but after a dispute with the management in 1846 Michael Costa, conductor at Her Majesty’s, transferred his allegiance to Covent Garden, bringing most of the company with him. The auditorium was completely remodelled and the theatre reopened as the Royal Italian Opera on 6 April 1847 with a performance of Rossini‘s Semiramide. In 1852, Louis Antoine Jullien the French eccentric composer of light music and conductor presented an opera of his own composition, Pietro il Grande. Five performances were given of the ‘spectacular’, including live horses on the stage and very loud music. Critics considered it a complete failure and Jullien was ruined and fled to America. Costa and his successors presented all operas in Italian, even those originally written in French, German or English, until 1892, when Gustav Mahler presented the debut of Wagner’s Ring cycle. The word “Italian” was then quietly dropped from the name of the opera house.
On 5 March 1856, the theatre was again destroyed by fire. Work on the third theatre, designed by Edward Middleton Barry, started in 1857 and the new building, which still remains as the nucleus of the present theatre, was built by Lucas Brothers and opened on 15 May 1858 with a performance of Meyerbeer‘s Les Huguenots. The Royal English Opera company under the management of Louisa Pyne and William Harrison, made their last performance at Theatre Royal, Drury Lane on 11 December 1858 and took up residence at the theatre on 20 December 1858 with a performance of Michael Balfe‘s Satanella and continued at the theatre until 1864. The theatre became the Royal Opera House (ROH) in 1892, and the number of French and German works offered increased. Winter and summer seasons of opera and ballet were given, and the building was also used for pantomime, recitals and political meetings.
Several renovations had taken place to parts of the house in the 1960s, including improvements to the amphitheatre but the theatre clearly needed a major overhaul. In 1975 the Labour government gave land adjacent to the Royal Opera House for a long-overdue modernisation, refurbishment, and extension. In the early 1980s the first part of a major renovation included an extension to the rear of the theatre on the James Street corner. The development added two new ballet studios, offices, a Chorus Rehearsal Room and the Opera Rehearsal room. Dressing rooms were also added. By 1995, sufficient funds from the Arts Lottery through Arts Council England and private fundraising had been raised to enable the company to embark upon a major £213 million reconstruction of the building by Carillion, which took place between 1997 and 1999, under the chairmanship of Sir Angus Stirling. This involved the demolition of almost the whole site including several adjacent buildings to make room for a major increase in the size of the complex. The auditorium itself remained, but well over half of the complex is new. The new building has the same traditional horseshoe-shaped auditorium as before, but with greatly improved technical, rehearsal, office, and educational facilities. Additionally, a new studio theatre, the Linbury, as well as more public space was created. The inclusion of the adjacent old Floral Hall, which had fallen into disrepair and was used as a scenery store before redevelopment, created a new and extensive public gathering place. The venue is now claimed by the ROH to be the most modern theatre facility in Europe. Surtitles, projected onto a screen above the proscenium, have been used for all opera performances since they were introduced for schools matinees in 1984. Since the reopening of the theatre in 1999 an electronic libretto system provides translations onto small video screens for some seats, and additional monitors and screens are to be introduced to other parts of the house. In 2014 design work, known as the Open Up Project, began with the aim of improving the entrances, lobby areas and the Linbury Theatre.