John Lewis was the first major tenant to sign up in February 1995, albeit with major concessions, such as the offer of 300,000 sq ft (28,000 m2), one-fifth of the entire floor space, on three levels. This gave Bluewater credibility to sign more names, including the two other anchor stores: House of Fraser followed in June 1996 by Marks & Spencer. 90% of the retail space was committed by March 1998. Construction, undertaken by Bovis Lend Lease, started on 1 May 1996. At its peak, the site employed 2,500 workers simultaneously. In all, 20,000 people worked 11.5 million hours on the construction of Bluewater. At the planned opening date, 16 March 1999, Bluewater was inaugurated with 99% of the shops open for business. The total cost of construction was around GBP £400 million.
With further expansion and development in the shopping centre industry since Bluewater’s opening in 1999, perhaps most prominently the entry of Westfield London and Westfield Stratford City into the market, Bluewater has looked to make changes to its offering to keep the centre up to date and provide new and additional customer experiences. Numerous stores have been refurbished, expanded or relocated in recent years as the centre looks to expand and upgrade its mix of retailers, and there have been some major construction projects, mostly centred on the three leisure/dining ‘villages’, undertaken or proposed. In late 2006, Dartford Borough Council granted planning permission for Bluewater to build a two-story events venue of 5200 m2, and further extend the south side of the centre. Construction on the extension began in early 2010, and when completed in 2011 the expansion added more restaurants to the Plaza (formerly Water Circus) section, including a Jamie’s Italian, Wagamamas and Browns. The new Glow events centre opened as part of the extension spans two floors, and has held events such as the BBC‘s Good Food Show: Spring. The events venue was developed alongside the existing entertainment provision in this area, the Showcase cinema which has been present in this area (initially as a Hoyts multiplex) since the opening of Bluewater.
During 2012, the Wintergarden food court area off Rose Gallery was extensively refurbished. Much of the food court was closed for part of the year to enable the work, with McDonalds notably unavailable at Bluewater throughout the period, though the Pizza Hut, Nando’s restaurants to the far side of the area (by the centre entrance), and the Ponti’s restaurant on the upper mall, remained open during the works. KFC relocated to Thames Walk to continue to trade during the development. When the Wintergarden works completed in October 2012, McDonalds, KFC and Harry Ramsden’s returned to their post, along with several new food outlets, most significantly a new Giraffe restaurant which had been constructed adjacent to McDonalds. The previous large ‘castle’-style McDonalds was replaced with a simple serving counter. A proposal was put forward in early 2013 to expand the West Village dining and specialist retail area currently sited off the Guildhall. This currently comprises a Waterstones bookshop, a training and recruitment facility, and Costa Coffee shop on the upper mall, and on the lower mall a row of boutique retailers leading out to a suite of restaurants including Carluccio’s, Pizza Express and Loch Fyne Restaurants amongst others. The proposal would see much of the existing infrastructure demolished and replaced with a new larger two-level ‘specialist retail’ area, similar to ‘The Village’ at Westfield London, with upmarket retail and restaurant facilities and mall access to both levels. Existing businesses would have to be relocated or removed from the centre to allow the works to go ahead.